East Amherst Solar Project

The proposed East Amherst Solar Project is being developed by Natural Forces Solar. The Project is located on the ancestral and unceded territory of the Mi’kmaq people, we acknowledge that working on these lands is a privilege that comes with a great deal of responsibility.

Glenholme Solar Project

The Glenholme Solar Project (the Project) is being developed by Natural Forces Solar. The Project would be located on approximately 38 acres of land, between 9629 and 9723 off Highway 2, Glenholme (PID 20134466). The Project would have an installed capacity of up to 6.3 MW, approximately 15,200 solar panels.

Lower Harmony Solar Project

The Lower Harmony Solar Project (the Project) is developed by Natural Forces Solar. The Project will be located on approximately 26 acres of land near Greenfield Rd, Parks Rd and Sugar Maple Drive (PID 20043600). The Project would have an installed capacity of up to 4.4 MW, approximately 10,600 solar panels.